200m³ of industrial wastewater:Integrated gas holder
Qingdao Haiyue Biogas Project
More than 2,000 sets of double-membrane gas tanks and their supporting equipment have been installed and operated in various provinces and cities in China.
The Brewery Wastewater Treatment system is designed to efficiently manage and treat the high organic load and varying flow rates typical of brewery effluent. The process involves a combination of primary, secondary, and tertiary treatment stages to remove suspended solids, organic matter, and nutrients from the wastewater.
Epoxy resin tank is a low-cost storage tank solution that enables rapid manufacturing and installation.
The 200 m³pig farm biogas project achieves resource recycling by converting breeding waste into clean energy
Address: Guangxi, China Volume: 500m³
Gas holders are installed as part of anaerobic digestion systems in wastewater treatment plants,agricultural digestion projects,landfill sites,and cogeneration plants that utilize biogas generated from organic materials as an energy source.